Why prefabricate?
The installation sector is growing but held back by labour shortages and grid congestion (Techniek Nederland, 2026). On site every hour is expensive and scarce. In a workshop you cut and assemble faster, more safely and with less waste. Data centre builders and large MEP contractors therefore increasingly work offsite.
What does a prefab workshop need?
A single, unambiguous set of data per position, so nobody has to re-measure or redraw.
- A position number that matches on drawing, bill of materials, pallet and site drawing
- A cutting list per channel, optimised on 6 m lengths
- A bill of materials per position with every nut, washer, channel nut and clamp
- A drawing with dimensions, tiers and drop
- An indicative load per position, confirmed by the manufacturer
How does it work with the configurator?
The job preparer configures brackets or frames per route and numbers each position. The configurator combines the cutting lists of all positions, so the workshop can cut per channel and per length. The bill of materials per position travels with the pallet. For the manufacturer or wholesaler this means one complete order instead of a pile of loose items.
| Output | For whom | Format |
|---|---|---|
| Dimensioned drawing | workshop and site | |
| Cutting list, optimised on 6 m | cutting shop | |
| Bill of materials per position | workshop and purchasing | |
| Enquiry with configuration | supplier | email or integration |
Frequently asked questions
What is prefabricated MEP?
Installation parts made and assembled in a workshop in advance, such as trapezes, frames and pipe modules, and placed on site per position.
Does Strutconfigurator supply prefab brackets itself?
No. The configurator supplies the data per position. Assembly is done by your workshop, your supplier or an assembly partner.
Can I order several positions at once?
Yes, the enquiry combines the positions with their bills of materials and the overall cutting list.